1、导轨架安装时,应用经纬仪对升降机在两个方向进行测量校准,其垂直度允许偏差为其高度的5/10000。
When mounting the rail frame, the application of a lift for theodolite measurement calibration in both directions, the degree of tolerance for the vertical height of 5/10000.
2、导轨架顶端自由高度、导轨架与附壁距离、导轨架的两附壁连接点间距离和最低附壁点高度均不得超过出厂规定。
Free height of the top rail rack, rack rails attached to the wall with the distance between the two rails rack attached to the wall connection point distance and the height of the lowest point of the mural shall not exceed factory requirements.
3、应保证升降机的整体稳定性,升降机导轨架的纵向中心线至建筑物外墙面的距离宜选用较小的安装尺寸。
Should ensure the overall stability of the lift, the lift frame rails of the longitudinal centerline distance between the outer wall of the building should use a smaller installation dimensions. 

4、当人货两用电梯的安装和拆卸时必须由专业团队负责,并必须由经过专业培训、取得操作证的专业人员进行操作和维修。
When dual-use goods elevator installation and removal must be undertaken by a professional team, and must be trained to obtain operating permits for the operation and maintenance professionals.
5、地基应浇制混凝土基础,其承载能力应大于150KPa,地基上表面平整度允许偏差为10mm,并应有排水设施。
Pouring the concrete foundation should be based on its carrying capacity should be greater than 150KPa, on the ground surface flatness tolerance of 10mm, and should have drainage facilities. 
6、升降机梯笼周围2.5m范围内应设置稳固的防护栏杆,各楼层平台通道应平整牢固,出入口应设防护栏杆和防护门。全行程四周不得有危害运行的障碍物。
Lift ladder cage around 2.5m should be set within the range of a solid protective railings on each floor should be smooth solid platform channel, entrance should be located protective railings and protective door. There shall be no obstructions around the whole trip hazard running.
7、升降机的专用开关箱应设在底架附近便于操作的位置,馈电容量应满足升降机直接启动的要求,箱内必须设短路、过载、相序、断相及零位保护等装置。
Lifts dedicated switch box should be located in the vicinity of the location of the chassis for easy operation, feeding capacity should meet the requirements of the lift started directly, must be located inside short circuit, overload, phase sequence, phase and zero protection devices.